• HOME
  • About Us
      • Practice
      • History
      • People
      • Sustainability
      • Awards
      • Policies
  • Disciplines
  • Portfolio
  • HL Interiors
  • Heritage
  • News / Blog
      • Blog
      • News
  • Contact / Careers
      • Careers
      • Contact
Howarth Litchfield Architects Howarth Litchfield Architects

Barnet Health Centre

Barnet Health Centre

Screenshot 1
Screenshot 2
Screenshot 3

We have been working with a GP practice in Barnet to explore the redevelopment potential of their site, with the dual ambition of safeguarding local healthcare provision and supporting key workers with affordable housing.

The scheme looks to reprovide modern medical facilities alongside new residential accommodation specifically designed for NHS staff and other essential workers. This dual approach ensures the practice can continue to serve the community for decades to come, while also addressing the ongoing housing challenges faced by those working in frontline services.

Our design approach makes creative use of the site’s level changes to maximise the development footprint. This allows for the delivery of the highest possible number of residential units, without compromising the character of the surrounding area or the operational needs of the health centre.

We have guided the practice through pre-application discussions with the local authority and carried out detailed viability testing. This process has been crucial in balancing design aspirations with financial deliverability, ensuring the scheme is both practical and future-ready.

Share
  • Linkedin
  • Twitter
  • Pinterest
  • Facebook
  • Mail
Building Consistent Infrastructure Plans for London’s Health Estates
Quinquennial Inspections for The Methodist Church, Durham and Deerness Valley Circuit

Related

  • Screen-Shot-2019-04-01-at-21.44.54

    Adan House

    Health
    Case Study
  • MAIN

    Billingham Health Centre

    Health
    Case Study
  • PCN

    South East London PCN Estates Strategy – Phases I, II and III // London

    Health
    Case Study
  • Burney 1

    Burney Street Practice

    Health
    Case Study
  • IMG_7164

    Mawbey Group Practice

    Health
    Case Study

HL Architects in Durham, North East UK

  • Howarth Litchfield
  • Liddon House
    Belmont Business Park
    Durham
    DH1 1TW
    UK
  • +44 (0) 191 3849470
  • hlp@hlpuk.com
Latest Blog
  • 14 firms appointed to help Cumbrian council deliver £12m capital projects
    14 firms appointed to help Cumbrian council deliver £12m capital projects
    June 25, 2026
  • Veteranary Practice Expansion – Bridge Referrals
    Veteranary Practice Expansion – Bridge Referrals
    June 5, 2026
  • PROGRESS AT BRIDGE REFERRALS, BOLDON
    PROGRESS AT BRIDGE REFERRALS, BOLDON
    May 29, 2026
bsi-and-ukas

architects durham north east

Copyright Howarth Litchfield Partnership Ltd. All Rights Reserved ©2015 | EDOT3 WEB DESIGN NEWCASTLE
DSC03040
Building Consistent Infrastructure Plans for London’s Health Estates
IMG_2968
Quinquennial Inspections for The Methodist Church, Durham and Deerness Valley Circuit