Our role on the Riverside Dene Community Stadium, a new multi-million pound state-of-the-art 2,800 seater basketball stadium which will become the home of Newcastle Eagles, began at RIBA Stage 4 where we were appointed by Esh Construction to work with them on a Design and Build basis.
We took the Stage 3 design by the previous architect and developed the Revit model and internal layouts to ensure compliance with all relevant technical standards, Sport England requirements and Building Regulations, including a full technical review of the fire strategy for the building. We produced all the required technical drawing packages and worked closely with the steelwork and M&E subcontractors to achieve a fully coordinated set of building models and drawings.
Our role continued through the construction stage of the project with input into design team meetings and detailing workshops with the construction team.